LMI Holdings Key Projects
Phase 1 of 132 MVA, 330/34.5 kV substation at Dawa Industrial City. Completed October 2018 at an estimated cost of US$ 30 million. Meant to provide electricity for the Dawa Industrial Zone.
Concrete Sleeper Plant at Dawa. First of its kind in West Africa. Has the capacity to produce 1000 sleepers a day. Potential to save Ghana US$ 27 million per annum and boost the railway sector.
Commissioned in 2018. 92,000m2 Mega Warehouse located within the Tema Free Zones Enclave. Largest bonded and managed warehouse in Ghana. Estimated cost US$ 45 million.
165 MVA, 161/34.5/11.5 kV substation in the Tema Free Zones Enclave. Commissioned April 2015. Provides electricity to over 100 industries and businesses located in the Tema Enclave valued at US$ 35 million. Meridian Industrial Park – a brownfield industrial park that is home to more than 30 companies across industries.
Ongoing Projects
Dawa Industrial Zone Development
Smart City Development
Intermodal Transport (Trans-Volta Logistics ) Project
LMI Holdings is spearheading the development of the Intermodal Transport (Trans-Volta Logistics Network), a multimodal corridor with a projected cost of $200 million. This initiative aims to facilitate the transportation of containers and bulk cargo from the Port of Tema to a new center for upcoming industries. It is designed to support the growth of industries away from congested urban areas.
Solar and Water Treatment Plants
Specialized Industry Groupings at DIZ
- Textiles & Garments Village (170 acres)
- Automotive Manufacturing Park (310 acres)
- Food-Processing Park (180acres)
- Warehousing and Logistics Park (48 acres)
- Heavy Industrial Area (240 acres)
- Electronics Parks(132acres)
- Light Industrial Area(116acres)










Other Initiatives
The Trans-Volta Logistic Corridor intends to develop a complementary logistics corridor for the transportation of goods from the Tema/Dawa Industrial Cluster to Northern Ghana and beyond. The Project aims to develop a multimodal logistics corridor linking Tema to Ouagadougou via Lake Volta by establishing an efficient transit container corridor on Lake Volta, developing an industrial park at Debre (Northern Ghana), and capturing a greater share of transit trade volumes in the sub-region. Long term, the Project will boost regional trade and value-added manufacturing, while taking ~30,000 trucks off the road each year.
LMI Holdings seeks to develop, own, operate, and maintain the largest utility-scale solar power generation facilities in the West Africa sub-region, with the vision of installing up to 1,000 MW of solar energy by the year 2030 using the rooftop of its largest warehouse facility. The Mega Warehouse Roof Top Solar Project covering a total roof space of 92,000 square meters located within the TFZE and financed by the International Finance Corporation (IFC) will see an installed Rooftop Solar PV Capacity of 16.8 MWp, the largest rooftop solar project in Ghana and arguably in the whole of Africa. The project seeks to provide a cleaner and comparatively cheaper source of power, a very important segment of Ghana’s industrialization effort (i.e., the export-oriented companies within the Free Zone Enclave, whose businesses generated a total export revenue of US$ 1.09 Billion in the first half of 2021 alone, while creating a total of 30,189 jobs mainly in the manufacturing sector).
To ensure that LMI Holdings can operate and grow its industrial park (2,000 acres) and offer a reliable and sustainable water supply to future tenants within the Dawa Industrial Zone, it is developing the Dawa Water Supply Plant. To achieve this, LMI plans to construct a Water Treatment Plant (WTP) with an initial capacity of 4,000m3 / day located on the outskirts of the Dawa Industrial Zone. Raw water will be abstracted from the Volta River and conveyed to a water treatment plan through a 17.8 km transmission main. Following treatment, water will be stored before onward distribution to clients in the DIZ and surrounding areas.