The Atlantic Power Plant is a 350MW Combined Cycle Turbine Power Plant to be located on Ghana’s eastern coast near Dawa. The plant will be the first development in the Dawa Energy Park a purpose built power and fuel facilities enclave and will utilize tri-fuel heavy duty gas turbines in combined cycle. An MOU with a strategic equity partner was signed in late 2016 and the plant is expected to reach financial close in Q2 2019. The project is expected to cost $700M

Comments are closed.