The Atlantic Power Plant is a 120MW Combined Cycle Gas Turbine Power Plant to be located in the Western Region of Ghana. The plant will utilize 2x GE Frame 6B technology in combined cycle and is expected to run on either natural gas or LCO. Financial close expected in the second quarter of 2016 with Commercial operation date to follow in the 4th quarter of 2017. The project is expected to cost ~$180M

Comments are closed.